PRINT

Türkiye: Antalya Alanya Motorway

SUMMARY

STATUS
Proposed
MEMBER
Türkiye
SECTOR
Transport
E&S CATEGORY
Category A
PROJECT NUMBER
000982

FINANCING

PROPOSED FUNDING AMOUNT
USD130 million
FINANCING TYPE
Nonsovereign

TIMELINE

CONCEPT REVIEW
May 12, 2025

OBJECTIVE

To improve the connectivity and reduce travel time by construction of an alternative route to the existing state highway.

DESCRIPTION

The Project involves design, finance, construction, operation, maintenance and repairs of the Antalya – Alanya motorway in Türkiye’s Mediterranean coast (the Project). The motorway is 117.8 km in length with mostly 3 lanes in each direction (2x3). The new proposed motorway will run parallel to the existing toll-free D400 state highway. It will not only provide a faster direct connection between the regions of Antalya and Alanya, but also significantly alleviate the congestion on the state highway, thus improving travel time and road safety for both the residents and the tourists.

Antalya is the fifth most populated city in Türkiye, given its proximity to the Antalya international airport, a major international hub (ranked second in terms of the number of foreign visitors in Türkiye and the third busiest airport in the country). The Antalya province has witnessed a significant increase in foreign tourist arrivals, reaching over 20.6 million (in 2023), making it the fourth most visited city in the world. As such, the location of the Project strategically addresses a need for an efficient motorway in the region, which is experiencing a rapid growth of tourism, both from local and international traffic.

The Sponsor of the Project is Limak Insaat Sanayi ve Ticaret A.S. (Limak Insaat or the Sponsor), the construction arm of Limak Holding. Limak Insaat is the largest contractor in Türkiye and has extensive experience in infrastructure sectors such as highways, bridges, airports, ports, dams and hydroelectric power plants.

The Project was awarded to the Sponsor by the General Directorate of Highways (the KGM or the Authority) under a Build-Operate-Transfer (BOT) model. The Implementation Contract (IC) between the Sponsor and the KGM was signed on October 14, 2024. The concession period is 15 years, which includes 3 years of construction followed by 12 years of operation period, post which the Sponsor shall transfer the motorway back to the KGM free of charge. As per the IC, the Project benefits from Traffic Guarantee Revenue from the KGM, which covers 100,000 automobile equivalent per day. If, at any point throughout the concession period, the actual traffic is less than the guaranteed level, the KGM will guarantee a shortfall of up to 100,000 automobile equivalent per day. The Project benefits from the Debt Assumption Agreement (DAA) from the Turkish Treasury.

ENVIRONMENTAL AND SOCIAL INFORMATION

Applicable Policy and Categorization. The Bank’s Environmental and Social Policy (ESP), including the Environmental and Social Standards (ESSs) and the Environmental and Social Exclusion List (ESEL), will apply to the Project. Based on the Bank’s ESP and the preliminary screening, the proposed Project is categorized as “A” as it is likely to have significant adverse environmental and social (ES) impacts that are irreversible, cumulative, diverse or unprecedented. The Project involves the design and construction of approximately 117.8 km (in length) of motorway along with ancillary facilities connecting the Antalya and Alanya regions. ESS1 (Environmental and Social Assessment and Management) and ESS2 (Land Acquisition and Involuntary Resettlement) will apply as the proposed activities will involve major civil works that require the acquisition of land. ESS3 (Indigenous Peoples) will not apply as no Indigenous Peoples will be affected by the proposed Project.

Environmental and Social Instruments. An Environmental and Social Due Diligence (ESDD) has been conducted by WSP, an independent international E&S consultancy firm. As per Turkish Environmental Impact Assessment (EIA) Regulations 2014, KGM had prepared an EIA report that was submitted in 2016, and subsequently, environmental clearance was obtained from the Ministry of Environment, Urban and Climate Change in August 2018. The Borrower is updating the Environmental and Social Impact Assessment (ESIA) and Non-Technical Summary of the ESIA based on the lender’s requirements. The draft version of the ESIA is supplemented with Resettlement Action Plan (RAP), Stakeholder Engagement Plan (SEP), Biodiversity Action Plan (BAP), Cultural Heritage Management Plan (CHMP) while other Management Plans are under review stage. A draft Environmental and Social Action Plan (ESAP) has also been prepared to identify and address identified gaps based on the ESDD conducted by the lender’s independent consultant. The Bank will conduct field-based ES examinations during project preparation as part of the due diligence. A number of qualified resources have already been assigned, and additional resources will be engaged as required to implement the ES Management Plan (ESMP), as well as the plans and procedures developed for the Project.

Environmental Aspects. The proposed Project is expected to bring environmental benefits by improving traffic flow through a sustainable infrastructure in a high tourism catering region. The motorway alignment will be a new linear infrastructure proposed through natural (forests, wetlands, rivers etc.) and modified habitats such as agricultural lands, urban centers etc. The ancillary components of the Project during construction will be camp sites, batching plants, quarries, material storage areas, etc. The construction activities will involve removal of vegetation, grading of land, stripping of topsoil, earthwork, asphalting, civil constructions, blasting operations at quarries, increased vehicular movements etc. This will lead to potential adverse effects such as habitat destruction, instability in landforms, change in landscape, increase in noise and vibration level, dust emissions, waste generation, and will potentially impact the wildlife and community in and around the construction area. In the operation stage, the key potential adverse impacts anticipated are related to vehicular and dust emissions and an increase in noise levels. Those risks and impacts in the period of construction and operation will be addressed by the implementation of ESMP, ESAP, BAP, and other plans, but ESDD identified that the management plans prepared for the Project require strengthening as per lender’s requirement.

Social and Gender Aspects. The Project is expected to bring positive social impacts to the local population by enhancing road conditions and safety and reducing travel time in a congested area. The main social risks and impacts are associated with land acquisition, physical and economic displacement, informal land use, and livelihood impacts. The total area to be expropriated is approximately 1,560 hectares, of which 53.9% is agricultural land. This area comprises 3,524 parcels in total, of which 2,085 are privately owned. A draft RAP has been prepared to define mitigation, compensation, and livelihood restoration measures. A RAP Fund is proposed to be established by the Borrower to supplement the KGM resettlement budget, ensuring that compensation is paid at replacement cost. These payments shall be made by the SPV. Another key risk and potential impact relate to cultural heritage. To date, a total of 55 archaeological cultural heritage resources have been identified through targeted walkovers and desktop reviews, including seven previously recorded sites and 23 newly identified ones within the Project footprint. Given the high likelihood of encountering additional resources during Project preparation and construction, robust measures are needed to avoid or minimize impacts, which are being developed in a CHMP. Additional risks and potential impacts are related to labor and working conditions and labor influx, community health and safety, and gender-based violence. The potential impacts of project activities on women both in the community and among the project workforce are being assessed as part of the ESIA. In consultation with relevant stakeholders, appropriate measures are being identified to prevent and mitigate potential negative impacts associated with labor influx, including risks of gender-based violence. These measures are being incorporated into the ESMPs, Labor Management Plan (LMP) and other management plans. 

Occupational Health and Safety (OHS), Labor and Working Conditions (LWC). The construction of a new motorway will necessitate the engagement of a substantial workforce for a duration of a minimum of three years. The potential OHS risks associated with construction activities are assessed during the preparation of the ESIA. To mitigate these risks, relevant policies and procedures related to OHS, labor standards, and working conditions are being reviewed, and necessary mitigation measures are incorporated into the relevant ESMPs. LWC risks/impacts are being and will be managed through the implementation of HR Policy-LMP. The provisions of the HR Policy-LMP will be implemented by the contractor during both the construction and operation phases.

Stakeholder Engagement, Consultation, and Information Disclosure. A draft SEP has been developed to guide meaningful and inclusive engagement with a broad range of stakeholders including project-affected people (PAPs) and the vulnerable groups identified. The SEP outlines the approach, methods and tools that are being used throughout project cycle. Consultations on the updated draft ESIA, ESMPs, and RAP will be carried out during the development of these instruments. The draft instruments were disclosed in English and Turkish by the Borrower in May 2025. Final documentation will be disclosed as appropriate. Further requirements will be included in the ESAP.

Project Grievance Redress Mechanism (GRM) and Monitoring Arrangement. A multi-tier project-specific GRM is being established to handle complaints and issues. The SEP defines the multiple GRM communication channels, including in-person, comment box, email, online, and telephone options. A worker’s GRM is also being established in accordance with ESP’s requirements. The Borrower has/is recruiting an EHS consultant to supervise and monitor the implementation of the plans and procedures. It is being proposed, Project will be monitored on a quarterly basis during construction phase and semi-annually during the first two years of the operation phase. The Borrower will be required to prepare the ES monitoring report quarterly during the construction phase, and semiannually during the operational phase, which must be based on the agreed format and submitted to lenders for review. AIIB will conduct onsite supervision missions as and when applicable in the implementation stage of the project.

PROJECT TEAM LEADER

Asian Infrastructure Investment Bank

Prakash Bajoria

Senior Investment Officer

prakash.bajoria@aiib.org

 

Daniel Pérez Pedraza

Investment Officer

daniel.pedraza@aiib.org

BORROWER

Antalya Alanya Otoyolu Insaat Yatirim ve Isletme A.S.

Özlem Aytöre

Environmental Social Manager

oaytore@antalyaalanyaotoyolu.com.tr

 

SPONSOR

Limak Insaat Sanayi ve Ticaret A.S.

Ebrunur Kapucu Yıldız

Project Finance Director

ekapucu@limak.com.tr

Home What We Do Project List Türkiye: Antalya Alanya Motorway