Sri Lanka: Kerawalapitiya – Port 2nd Transmission Line Project

SUMMARY

STATUS
Proposed
MEMBER
Sri Lanka
SECTOR
Energy
E&S CATEGORY
Category B
PROJECT NUMBER
000455

FINANCING

PROPOSED FUNDING AMOUNT
USD52 million
FINANCING TYPE
Sovereign

TIMELINE

CONCEPT REVIEW
December 16, 2020

OBJECTIVE

To increase the capacity and enhance reliability of the power transmission line in Greater Colombo urban development area.

DESCRIPTION

The Project is to construct a new 220kV transmission line with an approximately 16km long underground cable between Kerawalapitiya and Colombo Port. The transmission line will be connected to the new 220kV Kerawalapitiya SwS and the existing 220kV Port GSS. The project will be carried out by Ceylon Electricity Board (CEB), the national entity responsible for generation, transmission, and a major portion of distribution in electricity sector of Sri Lanka.

ENVIRONMENTAL AND SOCIAL INFORMATION

AIIB’s ESP, including the Environmental and Social Standards (ESSs), and Environmental and Social Exclusion List (ESEL), is applicable to the Project. ESS 1 (Environmental and Social Assessment and Management) and ESS 2 (Involuntary Resettlement) will also apply to the Project. ESS 3 (Indigenous Peoples) will not be applicable. Based on the available information, the Project has been identified as Category B on the basis that the anticipated Project environmental and social (ES) risks and impacts will be localized and temporary and can be mitigated through effective ES management.

The Feasibility Study for the proposed Project has been prepared and submitted to the Bank in October 2020, which details the environmental and social considerations. An Environmental and Social Impact Assessment (ESIA) will be prepared which will include an Environmental and Social Management Plan (ESMP) and any additional assessments or measures needed to ensure that the Project’s environmental and social risks and impacts are managed in a manner consistent with AIIB’s ESP and ESSs.

The main environmental impact of laying underground cables occurs during the construction phase. The civil works during this time can have impacts for the environment and community. Trenches need to be dug and access to the construction site cleared for heavy machinery such as earth moving equipment such as backhoes. Potential conflicts with other utilities such as water pipes, telecommunication lines, etc. will also be assessed. Impacts on biodiversity are not anticipated to be significant due to the location of the cable trenching i.e. along the Right-of-Way (RoW) of an existing road. During operation, the risk of health impacts due to electromagnetic fields (EMF) is low. The intensity of EMF effects decreases relatively quickly when moving away from the cable.

With respect to the social aspects, the Project is expected to generate largely positive social benefits to the overall population, services and businesses in the Greater Colombo area by providing stable and reliable access to electricity. The approximately 16km power cables will be installed in the underground space within the RoW of the public roads; therefore, no additional land acquisition is envisaged. Additional adverse social impacts and risks during the construction phase include temporary business disruption due to temporary restriction of access to houses, shops, and temples, potential temporary disruption of water and electricity supplies, impacts on schools in terms of safety and access, potential labor influx and the conduct of road workers during construction, in addition to health and safety issues for the communities along the road. The ESIA, mentioned earlier, will include measures to address the above impacts, including a chance find procedure for any physical cultural resources.

The proposed Project will be needed for a future power plant planned at Kerawalapitiya and the power plant will be considered as an associated facility of the Project. Discussions will be initiated with the implementing entity of the power plant to ensure alignment with the AIIB ESP. The future power plant when identified will be subject to project specific ESIA and will not be covered in the ESIA for this Project.

Project-level Grievance Redress Mechanisms (GRM) for Project-affected Peoples and project workers in accordance with the requirements of the ESP will be established and publicized by CEB to address complaints and grievances. Communities and individuals who believe that they are adversely affected by the Project will be able to submit complaints to the project-level GRM for their resolution. Consultations with stakeholders will be conducted. Disclosure of ES information including the Project-level GRMs and Project-affected People’s Mechanism (PPM) will be made available by CEB ES information will be posted on the websites of the CEB and AIIB in English, Sinhala and Tamil.

CEB Website: (English) (Sinhala) (Tamil)

PROJECT TEAM LEADER

Seung Myun Lee

Senior Operations Management Officer

sean.lee@aiib.org

 

BORROWER

Madara De Silva

Director
Department of External Resources
Ministry of Finance

madara@erd.gov.lk

IMPLEMENTING ENTITY

Dr. Herath M. Wijekoon

Chief Engineer Transmission Planning
Ceylon Electricity Board

cetptgp.tr@ceb.lk

 

Home Projects Project Summary Project List Project Details Sri Lanka: Kerawalapitiya – Port 2nd Transmission Line Project