To improve the conditions for economic development in rural areas by addressing infrastructure gaps through strengthening government planning systems and enhancing selected climate-resilient public infrastructure.
Project name: Rural Infrastructure Development Project 2 (Project, RIDP 2) – Results Based Financing Project
Applicable Policy and Categorization. The Project will be jointly co-financed with the WB as the lead co-financier and its Environmental and Social (ES) risks and impacts were assessed in accordance with the WB’s PforR Policy. To provide a harmonized approach to addressing the ES risks and impacts of the Program, and as permitted under AIIB’s Environmental and Social Policy (ESP), the WB’s PforR Policy will apply to the Program in lieu of AIIB’s ESP. Activities that are likely to have significant ES adverse impacts are not eligible for financing under the Program. The WB has categorized the ES risks of the Program activities as “Moderate” (which is equivalent to Category B if AIIB’s ESP were applicable).
Environmental and Social Instruments. An Environmental and Social Systems Assessment (ESSA) was conducted by the WB to evaluate the country’s systems for managing the Program’s ES risks and impacts. The ESSA includes a screening mechanism to exclude activities with high ES risks. It is complemented by the Program Action Plan (PAP), which outlines key capacity-strengthening and management measures. Consistent with AIIB's ESP provisions for co-financed RBF operations, AIIB reviewed the WB's assessments and considers them an adequate basis for evaluating the Program's ES systems, risks, and management measures.
Environmental Aspects. The environmental risks and impacts are primarily associated with the implementation of multiple small- to medium-scale civil works across dispersed mahallas under Results Area 2 (e.g., water supply systems, drainage, rural roads and small bridges, street lighting/energy connections, and selected social facilities). Key environmental risks include temporary construction-phase impacts such as dust, noise, vibration, spoil and construction waste generation, localized soil and water pollution risks (including from fuel/oil storage and spills), erosion and sedimentation (especially near waterways), and traffic disturbances. Water supply investments may introduce additional risks related to groundwater protection and safe management of drilling/excavation materials if not properly controlled. PAP includes relevant actions to standardize and strengthen environmental screening, implementation of the Environmental and Social Management Plan (ESMP) and mitigation measures, as well as supervision and monitoring processes.
Social and Gender Aspects. Social risks are mainly related to: (i) labor and working conditions and occupational health and safety (OHS) for workers across many worksites; (ii) community health and safety (CHS) during construction, including traffic safety, safe work zones, and risks from open trenches and equipment; (iii) potential SEA/SH risks linked to worker–community interactions, which require preventive measures and confidential reporting and referral pathways; (iv) land and access-related impacts, such as small-scale land take and temporary restrictions of access (particularly for linear works such as roads and pipelines), and risks associated with voluntary land donation if not carefully documented and monitored; and (v) governance and inclusion risks in participatory planning and benefit sharing, including the risk of elite capture and social exclusion of vulnerable groups and low-income households from decision-making or benefits, as well as potential grievances related to prioritization and implementation quality. The PAP includes measures to strengthen the ES capacity of implementing units to manage these social risks.
Stakeholder Engagement and Information Disclosure. The ESSA was informed by consultations with government agencies, local authorities, communities, and other stakeholders during Program preparation. The WB consulted stakeholders on the draft ESSA on 14 April 2026, disclosed on 3 April 2026, and finalized and redisclosed[1] in May 2026. A Stakeholder Engagement Plan (SEP) dated March 2026 has been prepared, disclosed[2] and will be implemented through the project life cycle. Engagement will follow principles of openness and life cycle engagement, informed participation and feedback, inclusiveness and sensitivity, and flexibility in engagement approaches (including use of in-person and digital/remote channels).
Project Grievance Redress Mechanism (GRM) and Monitoring Arrangement. Communities and individuals who believe they are adversely affected by the Program, as defined by the applicable policies and procedures, have the right to seek redress through established grievance mechanisms. They may submit complaints to the Program’s existing GRM, which is designed to handle concerns related to implementation, impacts, or other project-related issues in a transparent and timely manner. A project GRM is described in the SEP and provides multiple uptake channels including verbal submissions during meetings, grievance boxes, hotline, email/website, and social media/Telegram, with acknowledgment of receipt and resolution generally within two days.
Monitoring and Reporting Arrangement. The Ministry of Economy and Finance, through the Project Coordination Unit, will coordinate results monitoring and reporting for the Project. AIIB and WB will monitor implementation of the Project and the effectiveness of ES management systems throughout its implementation. The specific roles, reporting formats, frequency, and supervision arrangements will be further defined and coordinated with the WB and the Borrower.
[1] Final Environmental and Social Systems Assessment (ESSA) - Rural Infrastructure Development Program - Phase 2 - P509427
[2] Stakeholder Engagement Plan (SEP) - Uzbekistan - Rural Infrastructure Development Program - Phase 2 - P509427
Asian Infrastructure Investment Bank
Farzona Mukhitdinova
Investment Officer
World Bank
Simon Sottsas
Senior Social Development Specialist
Republic of Uzbekistan
Ilhom Norqulov
First Deputy Minister of Economy and Finance, Republic of Uzbekistan
Investment Directorate, Ministry of Economy and Finance, Uzbekistan
Boburbek Egamov
Head of the Joint Project Implementation Unit, Ministry of Economy and Finance, Republic of Uzbekistan