To increase the availability of energy-efficient baseload generation capacity in the Republic of Uzbekistan.
The Project involves the design, construction, maintenance and operation of a greenfield combined-cycle gas turbine (CCGT) power plant of 1,560MW capacity and associated infrastructure in Surkhandarya region in Uzbekistan. The Project is being developed by Stone City Energy (SCE, 20%), EDF (20%), Siemens Energy (25%) and Nebras Power (35%), through a dedicated project company SCE-Quvvat.
Consistent with the Uzbekistan Ministry of Energy’s “Concept note for ensuring the electricity supply in Uzbekistan in 2020-2030”, the Project is supported by a 25-years Power Purchase Agreement (PPA) signed between SCE-Quvvat and JSC National Electric Grid of Uzbekistan in April 2021. The Project is developed using Siemens Energy’s SGT5-9000HL turbines with baseload efficiency of more than 60 percent. The Project is expected to be operational in the first-half year of 2026.
The Project site is located in the Angor district of the Surkhandarya region of the Republic of Uzbekistan, on the northeastern coast of the Uchkizil reservoir, which is an off-stream reservoir type used for irrigation.
Applicable Policy and Standards. The AIIB’s Environmental and Social Policy (ESP), including Environmental and Social Standard 1 (ESS1) on Environmental and Social Assessment and Management, and the Environmental and Social Exclusion List (ESEL) is applicable to this Project. In accordance with AIIB’s ESP, an Environmental and Social Impact Assessment (ESIA) including an Environmental and Social Management Plan (ESMP) and a Stakeholder Engagement Plan (SEP) have been prepared. A comprehensive environmental and social due diligence (ESDD) is also being conducted. Based on the ESDD, an Environment and Social Action Plan (ESAP) is being prepared. A 9km 220/500kV overhead transmission line to be built by JSC National Electric Grid (NEGU) to connect the Project power substation to the existing national grid is identified as an Associated Facility (AF) to this Project. The environmental and social impacts of the AF are discussed in the ESIA and the mitigations are recommended to NEGU as the Borrower has no control or influence over this AF.
Environmental and Climate Change. During the construction phase, the Project will result in certain negative impacts locally, including air pollution, noise and vibration resulting from heavy machinery and vehicles, soil erosion, discharge of wastewater and disposal of construction wastes. Mitigation measures are included in the ESMP. During operation, the Project will use a closed-loop cooling system with water supplied from the Uchkizil reservoir. The local authority has confirmed the water use by the CCGT will not affect other water users, like agricultural irrigation. A wastewater treatment system will be established within the Project and treated water will be discharged into Uchkizil reservoir in compliance with the standards of Uzbekistan. Thus, the impacts on surface water quality would be negligible. The noise and air quality assessments show compliance with applicable standards, including the National and EU standards.
Based on terrestrial surveys conducted in Spring and Summer, no plant and animal species observed in the Project area meet the criteria requiring a Critical Habitat Assessment. Additional terrestrial and aquatic ecology surveys are performed in Autumn and the ESIA will be updated and disclosed accordingly. The water intake velocity will be limited with 0.15 m/s and a bubble curtain shall be applied to prevent fish and fauna to enter the intake. This Project is not expected to induce significant cumulative impacts as no other project is planned in the area of the Project.
The on-site GHG emissions during each construction year are estimated around 1,822 tons CO2eq and arise mainly from purchased electricity and combustion of diesel fuel by vehicles and equipment. During the operation phase, GHG emissions are estimated around 5,460,000 tons of CO2eq per year ie. 0.426 kg CO2eq per kWh of power generation. The Project has adopted climate resilience design, including a dry cooler system for condensers minimizing process water consumption.
Social Aspects. The land provided for the Project is from Surkhandarya regional reserve and was not under possession by any individual or legal entity. According to the decision by the regional administration, dated 30 August 2021, the Project area of 70 ha was allocated for the construction of a CCGT power plant. The decision was disclosed through the unified portal of the Ministry of Justice (https://e-qaror.gov.uz). During social surveys conducted in 2021 and 2022, no legal and/or informal land users were observed. There is no agricultural or other economic activity observed within the Project area.
Stakeholder Engagement and Information Disclosure. Consultations with project-affected people and communities, government agencies and other stakeholders have been carried out during the preparation of the ESIA. Focus group discussions with households including women from local communities were held. Additional consultations will be held after disclosure of the draft ESIA and ESMP, as detailed in the SEP to enable meaningful consultation and inclusive participation. The ESIA including the ESMP will be finalized according to the consultations and the additional surveys and also be disclosed if needed. The ESIA in English and Uzbek languages and the Non-Technical Summary and SEP in English, Russian and Uzbek languages are disclosed at the websites of SCE (stonecityenergy.com/projects) and AIIB. The hard copies of the ES documents will be made available at the Project site.
Grievance Redress Mechanism. A detailed grievance redress mechanism (GRM) is provided in the SEP. Locally appropriate public consultation and disclosure process will be implemented to timely disseminate information about the project-level GRM and the PPM of AIIB. The construction and commissioning phase will require two separate GRMs to be implemented, one for internal parties, i.e., construction and commissioning personnel, workers, project staff (including sub-contractors’ staff and visitors); and the other for external parties, i.e., Project-affected people. Similar GRMs will be established for the operation phase.
Asian Infrastructure Investment Bank
Eric Massart
Senior Investment Operations Specialist
Mehek Marwaha
Senior Investment Operations Specialist
Home Projects Project Summary Project List Project Details Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant