Georgia: Clean, Local, Equitable Access to Reliable Water Program

SUMMARY

STATUS
Proposed
MEMBER
Georgia
SECTOR
Water
E&S CATEGORY
Category B
PROJECT NUMBER
001222

FINANCING

PROPOSED FUNDING AMOUNT
USD174.90 million
FINANCING TYPE
Sovereign

TIMELINE

CONCEPT REVIEW
November, 2026

OBJECTIVE

The Program objective is to provide safe, reliable, and resilient water supply services in targeted rural areas of Georgia.

DESCRIPTION

AIIB results-based financing (RBF) will support the Government of Georgia’s Vision 2030 and the Water Supply and Sanitation Sector Development Framework 2021–2030, which aim for universal and equitable access to safe and affordable drinking water by 2030. Urban water services in Georgia have improved considerably, while there is a substantial gap in water supply services in rural areas. Only about a quarter of rural households have a piped connection, and 73% of those connected receive water only part of the day. Many rural systems depend on fragmented unregulated water sources and have little storage, without adequate treatment or water quality testing, increasing their exposure to droughts, heatwaves, and floods. 

AIIB will co-finance the Program with the Asian Development Bank (ADB), which approved its results-based loan on October 24, 2025. The Program is already under implementation, with AIIB's participation expected to support the Government financing share envisaged at ADB approval. ADB will remain as the lead co-financier, and both ADB and AIIB will channel financing to the same Program scope, results framework and Disbursement Linked Indicators (DLIs) framework under the overall unchanged financing envelope. 

AIIB will provide financing towards achievement of tangible results within the following Results Areas:

  • Results Area 1: Climate- and disaster-resilient water supply infrastructure. The Program will finance the design and construction of new and rehabilitated water supply systems in at least 100 rural settlements. The aim is to provide new or improved access to safe drinking water, available 24 hours a day, to at least 50,000 households, or about 150,000 people. Water Supply system designs will take account of climate risks, make use of energy-efficient technologies and embed assessment of water source sustainability.
  • Results Area 2: Stronger institutions and governance for rural water services. The Program will help put in place regulations for operating and maintaining rural systems, supported by digital tools, and affordable payment arrangements for household connections. It will also support public awareness work on water conservation and climate responsiveness, a national water supply and sanitation framework for the period beyond 2030, and protocols for managing public investment in the sector. Women’s participation in technical roles will be encouraged, including through a scale-up of the internship program.

ENVIRONMENTAL AND SOCIAL INFORMATION

Applicable Policy and Categorization. The Program will be co-financed with ADB as the lead co-financier. Its environmental and social (ES) risks and impacts have been assessed in accordance with ADB’s Safeguard Policy Statement (SPS, 2009). To ensure a harmonized risk management approach, and as permitted under AIIB’s Environmental and Social Policy (ESP), ADB’s SPS will apply instead of AIIB’s ESP. The Program will also be subject to AIIB’s Environmental and Social Exclusion List (ESEL) and ADB’s Prohibited Investment Activities List. ADB has categorized the Program as Category B for Environment, B for Involuntary Resettlement, and C for Indigenous Peoples. This categorization is equivalent to Category B, if AIIB’s ESP is applied. Any sites or activities in AIIB’s ESEL or of a Category A and high-risk nature, involving environmentally sensitive areas, physical displacement, and impacts on Indigenous Peoples are excluded from Program financing. 

Environmental and Social Systems Assessment. The principal ES instrument for the Program is the Program Safeguard Systems Assessment (PSSA), which was prepared by ADB and published in August 2025. PSSA assessed the applicable national legal framework, institutional capacity, ES risks, and gaps against ADB requirements. AIIB has reviewed the PSSA and considers it materially aligned with AIIB’s ESP requirements. To address the gaps identified through the PSSA, seven standard operating procedures (SOPs) have been developed through the Program Action Plan (PAP), covering ES screening; assessment and management planning; involuntary resettlement and vulnerable groups; labor and working conditions; community health and safety; grievance redress; and stakeholder engagement and disclosure. The PAP and SOPs also include Environmental, Health, Safety, and Social Management Plan (EHSSMP) requirements and screening checklists. 

Environmental and Social Aspects. ES risks are expected to be temporary, localized, and manageable. They are mainly linked to construction and rehabilitation phases, including dust, noise and vibration; construction waste; traffic disruption during pipelaying; occupational and community health and safety; and potential handling and disposal of asbestos in existing infrastructure, aligned with good international industry practice. Works will mostly occur along existing easements, with little, if any, land acquisition or economic displacement impacts. The Program is not expected to materially increase water abstraction, since it mainly replaces existing unregulated sources with safe piped water supply. Source yield and sustainability will be assessed for each system at the design stage. Key environmental considerations during operations are limited and associated mainly with the management of water treatment-related substances, energy consumption, and water resource sustainability. Key social risks relate to temporary construction-related disturbances like road closures and diversions, occupational and community health and safety, resettlement compensation falling below replacement value and poor treatment of vulnerable groups, including non-titleholders. Physical displacement is excluded from the Program and will be confirmed during the screening and alternative analysis phase. These risks and impacts are expected to be manageable through the implementation of project-specific EHSSMPs, contractor management requirements, established safeguards procedures, and monitoring arrangements. In addition, ADB has classified the Program as having “Some Gender Elements.” Gender considerations will also be integrated into consultations and the grievance redress mechanism.

Stakeholder Engagement, Consultation and Information Disclosure. A dedicated SOP sets out procedures for stakeholder identification, consultation, disclosure and feedback throughout the project cycle. The PSSA is disclosed on ADB’s website.[1] A summary of the PSSA translated into the local language will be disclosed on the UWSCG and AIIB websites and shared through stakeholder engagement activities. 

Project Grievance Redress Mechanism (GRM) and Monitoring and Reporting Arrangements. The GRM, embedded in the stakeholder engagement SOP, builds on UWSCG’s existing 24-hour hotline, head-office complaint handling and regional service center access points. The Program will strengthen these channels with procedures for registering, escalating, resolving, and reporting grievances. The Ministry of Regional Development and Infrastructure (MoRDI) through the UWSCG will be responsible for the overall coordination and monitoring of the Program results, and semiannual ES monitoring report will be prepared and shared with ADB and AIIB for review. AIIB will join ADB’s performance monitoring missions annually during the implementation phase and carry out ongoing monitoring until financial close.

[1]ADB. 2025. Clean, Local, Equitable Access to Reliable (CLEAR) Water Program: Program Safeguard Systems Assessment. August. https://www.adb.org/sites/default/files/project-documents/58470/58470-001-pssa-en.pdf

PROJECT TEAM LEADER

Asian Infrastructure Investment Bank

Farzona Mukhitdinova

Investment Officer,

farzona.mukhitdinova@aiib.org

 

Han Wang

Investment Officer,

han.wang@aiib.org

 

ADB

Maria Pia Ancora

Principal Urban Development Specialist

mpancora@adb.org

BORROWER

Georgia, represented by the Ministry of Finance

Ekaterine Guntsadze

Deputy Minister, Ministry of Finance of Georgia

info@mof.ge

IMPLEMENTING ENTITY

United Water Supply Company of Georgia (UWSCG)

Salome Vashakidze

Deputy Director for Financial Affairs, United Water Supply Company of Georgia